ents:public:minutes:2020-2030:2020_21:2020_07_29

This is an old revision of the document!


2020-07-29 University of St Andrews Students’ Association — Ents Committee Meeting

Those present Ryan Delaney, Tom Groves, Lucy Brook, Kian Cross, Andrew Barron, Sam Lane, Nikita Shvedov, Will Jamieson, Alan Chodyniecki

Date 29th July 2020 6:04pm–6:47pm

  • Updates on the Countdown to St Andrews video.
  • AOB.
  • Users meetings will be online.
  • They will only go ahead if we are teching for things.
  • We may tech external events.
    • This is unusual.
    • We usually just give them them a flight case of equipment and let them sort it themselves.
    • However, seeing as the majority of out events are likely to be external, it may better for us to do it.
  • No Mermaids for first semester.
  • Probably going to leave the old SharePoint up for legacy reasons.
  • Ryan is working on an introduction video. Mika said Ryan looks like a robot so he needs to redo it
  • Big welcome to Polly.
  • Chris is now working on what access Ents will have to the tech box when we return.
  • There is a provisional 'no reason why not' for access, so long as nothing substantial changes.
  • Union will be opening at some points in the next few weeks. So we should have a firm idea on what is happening a few weeks after that.
  • Hopefully as we approach Freshers Week we will get some more info on what we can and cannot do.
  • The University is taking over venues across the town, including The Stage.
  • We will not have access during teaching time in the week.
  • Hopefully the university will bring their own equipment.
  • We can then take down the main projector and use it for outdoor events.
  • We are looking to continue in person training.
  • We are not sure what form that will take and it depends on our access to the venue.
  • There is limited information and we are waiting on responses from various people.
  • We will use Teams Live.
  • We may have a follow up event for people who are interested in joining Ents, where they can ask specific questions.
  • We need to request access for Teams Lives through IT services.
  • They need a rough idea of what we're doing, so we should produce a running order.
  • We may stream on Facebook too.
  • Tom has given us a slot: Saturday 5th September 4–5pm.
  • The Union is pushing outdoor events.
  • They are going to try and get alcohol licensing for the piazza and field (directly behind the Union). Therefore there will be more events in those places.
  • There may be more outdoor events on University grounds around St Andrews. So Ents will be doing remote setups.
  • The main projector *should* be bright enough for outdoor projection.
  • Events will be things such as outdoor cinemas and outdoor music gigs at venues around town.
  • Estates is risk assessing every venue in St Andrews (including University buildings).
  • So getting the Spanish Gardens risk assessed, for example, is not high on their priorities.
  • A live music event in the Botanic Garden is in the planning process. More info to come soon.
  • Ryan has started reaching out to companies about hires and has also reached out to Estates to see if they can provide power for outdoor events.
  • We need to decide what we need to buy and hire to make our equipment work outside.
  • We need to make everything as safe as possible.
  • We should do this soon so we have a list of equipment ready for when we are given the go-ahead.
  • Ryan is getting information about power requirements for outdoor events.
  • We should move some cables from backstage to the tech box, in case we need to run a small event at small notice and cannot access backstage due to lectures.
  • The Performing Arts Affiliates are planning on doing much smaller events, so the tech requirements will be much smaller (or none at all).
  • Everyone — Send Alan a photograph of themselves for the 'Meet the Committee' posts by the next meeting.
  • Ryan — Put together something to organise Countdown to St Andrews.
  • Ryan — Put together something to organise hires for equipment waterproofing.
  • Ryan — Create a suggestions document for website.
  • Start working on lights programming, if we are going ahead with this.
  • Date 5th August 2020 at 6pm
  • ents/public/minutes/2020-2030/2020_21/2020_07_29.1652381972.txt.gz
  • Last modified: 2022/05/12 18:59
  • by shona.mg